The New Build Protection Checklist
Nicole RoeChecklist · 4 min read

The New Build Protection Checklist

The three warranty clocks, the three inspections before closing and what each one sees, the email I'd send about a crack, the photo routine, and the two dates to put in your phone the day you close.

01 Cosmetic or construction?

A Lennar homeowner in Texas says the company called a crack he can see daylight through purely cosmetic. On September 26, he said that after a third inspection, Lennar agreed there is a structural problem. Lennar told the New York Post it stands by its homes and that every home is evaluated on its individual facts. That one word is the part I want you to understand before you build.

Cosmetic goes on the punch list. A paint touch-up, a little caulking, a cabinet door that needs adjusting. The punch list is just the list of small fixes every new house has.
Construction problems get attention right away. A structural crack, a plumbing leak, a door that suddenly won't close.

It isn't just words. Most builders' warranties sort problems by kind. Lennar's own warranty page is a good example:

Clock Covers Examples
1 year Workmanship (finish work) Paint, flooring, cabinets, drywall
2 years Systems Plumbing, electrical, heating and air
10 years Structure Foundation, load-bearing walls, roof framing

So the same crack can sit on a one-year clock or a ten-year clock, depending on what somebody calls it. Once a clock runs out, the builder doesn't have to fix that kind of problem anymore. Your builder's warranty may look different, so read yours before you sign, and ask which clock each kind of problem is on.

02 Three inspections before closing

Your city or county inspector checks the house against the building code, which is the minimum the law allows. That's a floor, not a quality check. A private inspector is someone you hire, and they work only for you. Who does what depends on your area, so ask.

Ask before you sign anything. Will my own inspector be allowed on site at each stage? Put the answer in writing. If your contract says no outside inspectors, nobody who works for you ever looks inside those walls.

Before the slab is poured. The slab is the concrete floor the house sits on. Your inspector looks at the steel in the footings, the pipes coming up through the ground, and how water drains away. The window can be a day or two, so get on the builder's schedule early.
Before drywall. Framing up, wires and pipes in, every wall open. The last inexpensive moment to fix what's inside.
Before closing. A full check of everything that runs: plumbing, electrical, heating and air, the roof and the ground around the house. Separate from the blue-tape walk with your builder.

Inspectors call these phase inspections. An inspector can only see what's visible that day, which is why the timing matters so much.

03 The final walk

You're not looking for perfection. You're checking that everything works the way it should.

Open every cabinet and every drawer. A cabinet door that needs adjusting goes on the punch list.
Turn on every light. Every switch, every room.
Run every faucet and flush every toilet. Look under each sink while the water runs.
Sort what you find. Paint, caulk, a door that needs adjusting: the punch list. A crack getting wider, water where it shouldn't be, a door that stops closing: an email the same day.

Not sure which kind it is? That's not on you to figure out. Write it down and send it anyway.

04 The email I'd send about a crack

A phone call leaves no proof. A dated email shows you reported it in time. Lennar's warranty says a claim sent more than thirty days after a warranty ends is not the company's obligation, and most builders' paperwork has a line like that. Write it so nobody can misread it: room, spot, size, date, photo.

My warranty email
Subject: Warranty claim, [ADDRESS], [DATE]

Hello [BUILDER'S WARRANTY CONTACT],

I'm reporting [WHAT IT IS, e.g. a hairline crack] in the [ROOM], [WHERE EXACTLY, e.g. above the pantry door], about [SIZE, e.g. the width of a credit card]. I first saw it on [DATE]. Photo attached.

Please confirm you've received this, and tell me who you're sending out: someone from customer care or a structural engineer.

Thank you,
[YOUR NAME], [PHONE]
Photograph it again from the same spot every month. Any change is then on the record. A hairline that turns into daylight is exactly why dates matter.
Ask who's coming. Customer care handles small fixes. A structural engineer decides whether the house itself is sound.
05 Two dates for your phone

Put both in your phone the day you close.

Six months: walk the house again with your builder. Bring your monthly photos.
Around month eleven: a private inspector, one more time. Before the one-year warranty on the finish work runs out, so anything they find can still be claimed.
An inspection isn't meant to fail your project. It's designed to protect you.

Sources

Nicole's LibraryLibrary card
Free access

Keep reading free with your library card

One email opens this checklist and all 21 resources in Nicole's library. No account, no password.

It opens right here, and a copy goes to your inbox. You'll also get Nicole's new resources. Unsubscribe in one click.

Thanks
You finished it
Now do one thing

Before you sign, ask your builder in writing: will my own inspector be allowed on site at each stage?