The Cabinet Order Checklist
What I'd decide before any cabinet order, starting with your kitchen zones, the drawer test and what to measure, plus the three questions to ask first.
The U.S. tariff on imported kitchen cabinets is scheduled to double on January 1, 2027, from 25 percent to 50, according to the Federal Register notice of January 9, 2026. Every showroom will email you: order before January first. Here's what that email doesn't explain.
What I'd actually worry about. A cabinet that arrives wrong, or doesn't fit. The replacement is a brand new shipment that pays the new rate. The deadline doesn't make a rushed order cheaper. It makes a wrong one more expensive.
We order everything before demo day, the day the old kitchen comes out, but only once the plan's finished. Construction is for building, and planning is for deciding.
The day you sign a cabinet order, every drawer is locked in. The kitchen regrets people agree with most online are all lines on that order: the trash can with no home, the spice drawer next to the hot range, the microwave too high to lift a hot bowl out of, the sink that ate the island.
I don't design kitchens around the old work triangle of sink, stove and fridge. I design them around zones: the places where each part of a meal actually happens.
Those decisions are cheap on paper, and expensive once they're built.
On our cabinet drawings, the plans that show every cabinet, we label every drawer with what goes in it.
Three questions decide whether the extra cost lands on your invoice. You don't need to know the rules. You just need the answers.
Get the lead time, the weeks from order to delivery, in writing. Semi-custom (some options to choose from) usually takes about 4 to 8 weeks; full custom, built from scratch, 8 to 12 weeks or more.
Your contractor isn't the enemy. It's one team building one kitchen.
1. Where are the cabinets built, and where do the parts come from?
2. Are they in a warehouse here, or still being built? Lead time in writing?
3. Help me understand this price. Is it fixed the day I sign, or could a tariff change show up on the invoice?
Whenever they arrive. Open every box the day it comes. Always, always, always. Catch damage while there's still time to fix it.
The January deadline is a great reason to finish a plan, and a terrible reason to start one.
Sources
Keep reading free with your library card
One email opens this checklist and all 21 resources in Nicole's library. No account, no password.
Walk through a normal Tuesday dinner, from the fridge all the way to the trash, and write down every stop: each one is a zone, and each zone becomes cabinets.
Saving works best in your phone's browser. A copy is also in your inbox.