Nicole RoeChecklist · 4 min read

The Cabinet Order Checklist

What I'd decide before any cabinet order, starting with your kitchen zones, the drawer test and what to measure, plus the three questions to ask first.

01 What the January deadline really changes

The U.S. tariff on imported kitchen cabinets is scheduled to double on January 1, 2027, from 25 percent to 50, according to the Federal Register notice of January 9, 2026. Every showroom will email you: order before January first. Here's what that email doesn't explain.

The date that counts is the port, not your order. The tariff is paid the day the cabinets come into the country. One overseas cabinet factory says a made-to-order kitchen takes about four weeks to build, then six or seven weeks on the water. Order from overseas in November, and it lands in January anyway. The date has slipped once. It was first set for January 2026, then pushed back a year. It could move again. Your kitchen isn't about to cost twice as much. The tariff is charged on what the importer, the company bringing them into the country, paid. One cabinet seller's example: a set that cost the importer $3,000 carries about $750 of tariff at the current rate, about fifteen hundred dollars after January first. Every seller after the border marks that up, but it's not your countertops or your install, and it doesn't touch cabinets built here.

What I'd actually worry about. A cabinet that arrives wrong, or doesn't fit. The replacement is a brand new shipment that pays the new rate. The deadline doesn't make a rushed order cheaper. It makes a wrong one more expensive.

We order everything before demo day, the day the old kitchen comes out, but only once the plan's finished. Construction is for building, and planning is for deciding.

02 Your kitchen zones

The day you sign a cabinet order, every drawer is locked in. The kitchen regrets people agree with most online are all lines on that order: the trash can with no home, the spice drawer next to the hot range, the microwave too high to lift a hot bowl out of, the sink that ate the island.

I don't design kitchens around the old work triangle of sink, stove and fridge. I design them around zones: the places where each part of a meal actually happens.

Walk a normal Tuesday dinner, fridge to trash.
Mark where the groceries land. Every stop becomes a zone.
Mark where you chop.
Mark where the plates go after.
Mark where the backpacks get dropped. Because it's always the backpacks.
Turn every stop into cabinets. Microwave in a drawer: that cabinet is built as drawers, not doors. Trash by the sink: a slide-out trash cabinet next to it.

Those decisions are cheap on paper, and expensive once they're built.

03 The drawer test and what to measure

On our cabinet drawings, the plans that show every cabinet, we label every drawer with what goes in it.

Write what goes in every drawer. Pots here. Spices here, away from the heat. Lunch boxes here.
Leave about 30 percent of every storage space empty. That's room for real life.
Find any drawer you can't name. If you can't say what goes in a drawer, you're not ready to order it.
Hold the final order for real measurements. Someone measures the real walls and openings, because a built room is never exactly the plan.
Design for Tuesday, then order. Not the other way around.
04 Three questions before you sign

Three questions decide whether the extra cost lands on your invoice. You don't need to know the rules. You just need the answers.

Question If the answer is What it means
1. Where do the cabinets, and the parts, come from? Built here in the U.S. No tariff on the cabinet. Imported parts can pay it.
A country with a trade deal with the U.S. The tariff is often lower.
2. Are they in a warehouse here, or still being built? In a warehouse here They paid the old 25 percent when they arrived.
Still being built overseas Count the weeks to January first: the later they land, the likelier the new rate.
3. Is the price fixed the day I sign? Not fixed A tariff change could show up on the invoice.

Get the lead time, the weeks from order to delivery, in writing. Semi-custom (some options to choose from) usually takes about 4 to 8 weeks; full custom, built from scratch, 8 to 12 weeks or more.

Your contractor isn't the enemy. It's one team building one kitchen.

My three cabinet questions
Before I sign the cabinet order:
1. Where are the cabinets built, and where do the parts come from?
2. Are they in a warehouse here, or still being built? Lead time in writing?
3. Help me understand this price. Is it fixed the day I sign, or could a tariff change show up on the invoice?

Whenever they arrive. Open every box the day it comes. Always, always, always. Catch damage while there's still time to fix it.

The January deadline is a great reason to finish a plan, and a terrible reason to start one.

Sources

Nicole's LibraryLibrary card
Free access

Keep reading free with your library card

One email opens this checklist and all 21 resources in Nicole's library. No account, no password.

It opens right here, and a copy goes to your inbox. You'll also get Nicole's new resources. Unsubscribe in one click.

Thanks
You finished it
Now do one thing

Walk through a normal Tuesday dinner, from the fridge all the way to the trash, and write down every stop: each one is a zone, and each zone becomes cabinets.

Saving works best in your phone's browser. A copy is also in your inbox.