Cabinet Tariffs Are Set to Double on January 1. A Designer on What to Decide Before You Order

The U.S. tariff on imported kitchen cabinets is scheduled to double on January 1. What that date really means, and what to decide before you order.

Nicole Roe
Luxury interior designer, founder of R. Nickson Interiors
November 5, 2026
Watch the video, or read the article below.
6:24
10 chapters
  1. 0:00 The cabinet tariff set to double on January 1
  2. 0:12 The tariff is paid at the port
  3. 0:59 Your kitchen won’t cost twice as much
  4. 1:32 What January actually changes
  5. 2:16 What a cabinet order locks in
  6. 3:08 Zones, not the work triangle
  7. 3:33 The drawer test and final measurements
  8. 4:19 Question one: where are they built?
  9. 5:00 Question two: warehouse or still being built?
  10. 5:36 Question three: is the price fixed?

The U.S. tariff on imported kitchen cabinets is scheduled to double on January 1, from 25 percent to 50. But the date that counts isn’t the day you order. It’s the day your cabinets reach a U.S. port.

If you’re planning a kitchen right now, you’re about to get the same email from every showroom: order before January 1. And I get why that feels urgent. But here’s what that email doesn’t explain.

The tariff is paid at the port

The tariff gets paid the day the cabinets come into the country. When this tariff first started, in October 2025, cabinets that were already at sea paid it the day they landed.

One overseas cabinet factory says a made-⁠⁠to-⁠⁠order kitchen takes about four weeks to build. Then it spends six or seven weeks on the water. That’s around eleven weeks from order to port. So a kitchen you order from overseas in November lands in January anyway.

Diagram from the video: a factory, a ship on the ocean and a kitchen, over a 4 week bar and a 6 to 7 week bar
0:40 in the video Then it spends six or seven weeks on the water.

And one more thing. This date has already slipped once. The increase was first set for January 2026, then pushed back a year. It could move again. I just wouldn’t plan a kitchen around that.

Your kitchen won’t cost twice as much

Now the good news: your kitchen is not about to cost twice as much. The tariff is charged on what the importer, the company bringing the cabinets into the country, paid for them. Not on your finished kitchen.

One cabinet seller put it like this. Say a set costs the importer $3,000. The current rate puts about $750 of tariff on that. After January 1, it’s about fifteen hundred. That’s real money, and every seller between the border and your kitchen marks it up. But it’s not your countertops or your install, and it doesn’t touch cabinets built here.

What January actually changes

Honestly, what I’d worry about is a cabinet that arrives after the deadline and turns out wrong, or doesn’t fit. If the first set is wrong, the replacement is a brand new shipment that lands after the deadline, so it pays the new rate.

So here’s what we do at my design firm. We order everything before demo day, the day the old kitchen comes out. I’m all for ordering early. But only once the plan’s finished.

Construction is for building, and planning is for deciding.

The deadline doesn’t make a rushed order cheaper. It makes a wrong one more expensive.

What a finished plan locks in

So what does finished actually mean? It’s a lot more specific than most people think. The day you sign that cabinet order, every drawer in your kitchen is locked in.

Think about the kitchen regrets people agree with most online:

  • The trash can with no home.
  • The spice drawer right next to the hot range.
  • The microwave so high you can’t lift a hot bowl out of it.
  • The sink that ate the whole island.

Every single one of those is a line on a cabinet order. If the microwave goes in a drawer, the cabinet under it is built as drawers instead of doors. If the trash goes by the sink, that’s a slide-⁠⁠out trash cabinet right next to the sink. Those decisions are cheap on paper, and expensive once they’re built. And a cabinet you have to reorder after January 1 comes back in at the doubled rate.

Zones, not the work triangle

I don’t design kitchens around the old work triangle anymore, the sink, the stove and the fridge in a triangle. I design them around zones.

Walk through a normal Tuesday dinner, from the fridge all the way to the trash. Where do the groceries land? Where do you chop? Where do the plates go after? And where do the backpacks get dropped? Because it’s always the backpacks. Every stop on that walk becomes a zone, and every zone becomes cabinets.

Diagram from the video: a kitchen floor plan with the sink, range and fridge, a path drawn through dotted zones, labeled Tuesday
3:23 in the video Every stop on that walk becomes a zone, and every zone becomes cabinets.

The drawer test, then the measurements

Then there’s one more check before you order: the drawer test. On our cabinet drawings, we label every drawer with what goes in it. Pots here. Spices here, away from the heat. Lunch boxes here. And we leave about 30 percent of every storage space empty, because that’s room for real life. If you can’t say what goes in a drawer, you’re not ready to order it.

The last piece is measurements. The final order waits until someone measures the real walls and openings, because a built room is never exactly the plan. On one of our own projects, we held off ordering even a single storage cabinet until the measurements were final. Even one.

Design for Tuesday, then order. Not the other way around.

Three questions before you sign

Once your plan is finished, there’s one more step before you sign. Starting January 1, imported cabinets are scheduled to pay a 50 percent tariff at the U.S. border. Three questions decide whether that extra cost lands on your kitchen invoice.

  1. Where do the cabinets, and the parts, come from? The first question isn’t the price. Cabinets built here in the U.S. don’t pay this tariff. But cabinet firms say a lot of U.S. cabinet makers import their parts, and imported parts can pay it. If they come from a country with a trade deal with the U.S., the tariff is often lower. You don’t need to know the rules. You just need the answer.
  2. Are your cabinets already sitting in a warehouse here, or are they still waiting to be built? If they’re already in a warehouse here, they paid the old 25 percent tariff when they arrived, not the new 50. If they’re still being built overseas, count the weeks to January 1, because the later they land, the more likely they pay the new rate. And for anything made to order, get the lead time, the weeks from order to delivery, in writing. Semi-⁠⁠custom, so cabinets with some options to choose from, usually takes about four to eight weeks. Full custom, built from scratch, takes eight to twelve weeks or more.
  3. Is the price fixed the day I sign? This is how I’d ask it: help me understand this price. Is it fixed the day I sign, or could a tariff change show up on the invoice? Your contractor isn’t the enemy here. It’s one team building one kitchen, and a good contractor would much rather answer that now than after the invoice shows up.

And whenever they do arrive, open every box the day it comes. Always, always, always. You want to catch damage while there’s still time to fix it.

I put the zones, the drawer test, what to measure and all three questions into a free checklist, ready to send.

Honestly, the January deadline is a great reason to finish a plan, and a terrible reason to start one.

Questions people ask

When does the tariff on imported kitchen cabinets double?

The U.S. tariff on imported kitchen cabinets is scheduled to double on January 1, from 25 percent to 50. The date that counts is the day your cabinets reach a U.S. port.

Will the cabinet tariff double the cost of my kitchen?

Your kitchen is not about to cost twice as much. The tariff is charged on what the importer paid for the cabinets, not on your finished kitchen. It’s not your countertops or your install, and it doesn’t touch cabinets built here.

If I order cabinets from overseas in November, will they beat the deadline?

A made-⁠⁠to-⁠⁠order kitchen takes about four weeks to build, then it spends six or seven weeks on the water. So a kitchen you order from overseas in November lands in January anyway.

Do cabinets built in the U.S. pay the tariff?

Cabinets built here in the U.S. don’t pay this tariff. But cabinet firms say a lot of U.S. cabinet makers import their parts, and imported parts can pay it.

How long do semi-⁠⁠custom and full custom cabinets take?

Semi-⁠⁠custom usually takes about four to eight weeks. Full custom, built from scratch, takes eight to twelve weeks or more.

How should I ask about the cabinet price before I sign?

Help me understand this price. Is it fixed the day I sign, or could a tariff change show up on the invoice?

Sources

  1. Federal Register, January 9, 2026: the published notice of the increase to 50 percent
  2. Tax news: the increase postponed by one year (January 2026)
  3. An overseas cabinet factory’s timeline: build time and weeks on the water
  4. A cabinet seller’s explainer: what the tariff is charged on, and the worked example
  5. A cabinet seller’s notes for contractors: cabinets built in the U.S. and the October 2025 start
  6. A remodeler’s 2026 lead-⁠⁠time tracker: semi-⁠⁠custom and full custom cabinets

Your next step

01

This checklist · free

The Cabinet Order Checklist

What I’d decide before any cabinet order, starting with your kitchen zones, the drawer test and what to measure, plus the three questions to ask first.

Your first moveWalk through a normal Tuesday dinner, from the fridge all the way to the trash, and write down every stop: each one is a zone, and each zone becomes cabinets.

02

Nicole’s Library · free

Get free access to Nicole’s whole library

One email opens every checklist from Nicole’s videos, right here on the site, and each new one as she adds it.

  • Who Gets a Vote Checklist
  • Stay-⁠⁠⁠or-⁠⁠⁠Go Checklist
  • Teammate Ladder: How to Raise a Problem With Your Builder
  • Kitchen Traffic Checklist
  • Open Walls Checklist
  • Cushion: Your Renovation Budget Template
  • Electrical Walkthrough Checklist
  • Last Payment Checklist
  • Kids’ Room Furniture Checklist
  • Lineup: Your Trade-⁠⁠⁠by-⁠⁠⁠Trade Decision Checklist
  • New Build Protection Checklist
  • Laundry Walk-⁠⁠⁠Through Checklist
  • Decide Together Worksheet
  • Appliance Specs Checklist
  • Lighting Plan Checklist
  • Finish Order Checklist
  • Before-⁠⁠⁠Drywall Checklist
  • Contractor Interview Checklist
  • Cabinet Order Checklist
  • Countertop Promise Checklist
  • Picture-⁠⁠⁠to-⁠⁠⁠Plan Checklist

03

Work with Nicole

Already mid-⁠⁠project?

Through R. Nickson Interiors, my team designs and manages whole-⁠⁠home projects. Or learn the process yourself with The Highly Designed Home Method.

Free, by email

Follow by email: Nicole's new resources

New checklists and articles from Nicole's videos, as she adds them.

Free checklists, templates, and guides from Nicole's videos
For your build or renovation: the process, design decisions, and life mid-⁠⁠build
You confirm on Nicole's Library.
Your email stays with Nicole and the team that runs this library. Never sold.
Thanks
Share this article
Nicole Roe
Written by

Nicole Roe

Luxury interior designer, founder of R. Nickson Interiors

I studied building construction at Georgia Tech, and I run R. Nickson Interiors, a full-⁠⁠service luxury interior design firm that takes on 10 to 12 projects a year. Our work has been in Architectural Digest and HGTV Magazine, and on the cover of Kitchen & Bath Business. I speak at High Point Market. Every resource here is built from my videos and fact-⁠⁠checked.

Architectural Digest work featured HGTV Magazine work featured Kitchen & Bath Business on the cover High Point Market speaker Georgia Tech building construction
About Nicole
Keep watching

More from Nicole

All videos
Video thumbnail: Everyone Gets an Opinion. Not Everyone Gets a Vote: How to Handle Comments on the House You're Building
Nov 23

Everyone Gets an Opinion. Not Everyone Gets a Vote: How to Handle Comments on the House You’re Building

A colorful house got a comment joking about divorce papers. How to handle comments on the house you're building: one rule, and three steps.

Video thumbnail: Their Renovation Moved Them In With Mom. Should You Move Out?
Nov 22

Their Renovation Moved Them In With Mom. Should You Move Out?

One broken light switch is the reason Kaylei Fleming's family ended up living with her mom. Should you move out, or stay and live through it?

Video thumbnail: One TikTok About Singh Homes Cost a Homeowner A$883,000. How I'd Raise a Problem Instead
Nov 21

One TikTok About Singh Homes Cost a Homeowner A$883,000. How I’d Raise a Problem Instead

An Australian court ordered a homeowner to pay 883,000 Australian dollars over one TikTok about his builder. Here's how I'd raise a problem instead.