The Last Payment Checklist
The three contract questions I'd ask before you sign, how I'd handle every open item at the end of a build, the questions before the last payment, and the punch list email I'd send, word for word.
On November 9, 2026, an Indiana appeals court ruled that a couple owe their builder $221,704, more than their whole house cost. They'd held back about half of the price until things got fixed.
You've probably heard the advice online: never make the final payment until everything's done. That's pretty much what they did. But there was no signed list of what fixed meant. Money you hold back only works when it's tied to a list you both wrote down.
That list really starts long before the end, the day you sign. Most builds pay in steps. The foundation's done, you pay a draw, which is just one planned payment. The house is framed, you pay the next one. And the last one comes at the end. The page in the contract that lists when each payment is due is called a payment schedule. This contract had none, so when they disagreed at the end, there was no list in between.
Before you sign with a builder, I'd take these three questions to the table.
The last payment is tied to: punch list finished / final walkthrough / final inspection
Who pays the lawyers: ___ Both ways: yes / no
Limit on what I can claim: ___
My items on the list: ___
A punch list is the list of last fixes before a house is done, and who's doing each one. I teach that every open item on it is three things: documented, acknowledged, and scheduled. Written down, agreed by the builder, and given a date.
In the Indiana case, the list both sides were working from said nothing about moisture in the crawl space, the low space under the house. That was the very thing that worried the homeowners a few weeks later.
If something big comes up, don't panic. Problems at the end of a build are normal. Ask what happened, why it happened, and what the best fix is. None of those is about blame. Then let them in to finish, and confirm every visit in an email.
Before the final payment, ask the builder three things.
This is the email I'd send with the list, word for word. Fill in the blanks and attach your photos.
Hi ___,
Here is our punch list for the house. It has every worry we have, ours and our inspector's, each one with a photo.
Could you answer each item in writing? A reply that names the item, or your initials next to it, is perfect.
Then could you give every item a name and a date: who's fixing it, and by when?
Before the final payment, could you also tell us:
1. What's still open?
2. When will it be done?
3. Who's responsible?
Our own items on the list are: ___. We'll let you know as each one is done, so you can finish yours.
When your crew comes out, I'll confirm each visit in an email.
Thank you,
___
When that last item is checked off, you've got a real reason to make the last payment. And that's when you get your keys.
Hold a list, not just the money.Sources
Keep reading free with your library card
One email opens this checklist and all 21 resources in Nicole's library. No account, no password.
Open your contract, find the line about the last payment, and check what it's tied to: the punch list being finished, a final walkthrough, or the house passing its final inspection.
Saving works best in your phone's browser. A copy is also in your inbox.