Remodeling Spending Fell 18%, Census Bureau Says. How I’d Hire a Contractor

Remodeling spending is down 18% from a year ago. Why the lowest bid looks better than it really is, and how I compare contractors instead.

Nicole Roe
Luxury interior designer, founder of R. Nickson Interiors
November 6, 2026
Watch the video, or read the article below.
6:25
8 chapters
  1. 0:00 Remodeling spending fell 18%
  2. 0:28 Is it a buyer’s market?
  3. 0:59 Compare people, not prices
  4. 1:24 Test 1: competence
  5. 2:30 Test 2: communication
  6. 3:50 Emails, not texts, and a weekly update
  7. 4:31 Test 3: character
  8. 5:33 There’s no best contractor in town

The Census Bureau put out new numbers on November 2, and Americans’ remodeling spending is down 18% from a year ago. If you’re hiring a contractor in the next six months, the lowest bid on your table is about to look a lot better than it really is.

September alone was down 13% from August. That’s a first estimate, so those numbers do get revised. And honestly, remodeling is still way above where it was before 2020. So I’m not here to tell you the sky is falling.

Is it a buyer’s market?

You might be thinking, great, so it’s a buyer’s market. Not quite. In October, remodelers told the home builders’ association that the work they already have booked actually grew. So the good crews are still busy.

The slowdown is mostly on the homeowners’ side. Remodelers say some homeowners are hesitating. In one big homeowner survey, the share planning a really big project dropped from about one in eight to about one in fourteen.

And when money feels tight, the lowest number gets really, really loud.

Compare people, not prices

I studied building construction, and on my projects I sit right between the homeowner and the contractor. Here’s what that seat has taught me: the lowest proposal is rarely the least expensive project.

So in a market like this one, compare people, not prices. I look at three things:

  1. Competence: can they build it?
  2. Communication: will they communicate well?
  3. Character: can I trust them?

Test 1: competence

You already know to check license and insurance, and what your state requires, so I won’t lecture you on that. Here are the two things most people skip.

First, ask for the unknowns. A good proposal doesn’t just give you a number. It tells you what could change that number, like what’s not included, what’s only an allowance, and what nobody can see until the walls are open. An allowance is just a placeholder budget for something you haven’t picked yet. Someone who has built this kind of project before can name those things for you.

Illustration from the video: a contractor's proposal listing demolition, cabinets, countertops, tile, plumbing and electrical, with the total marked lowest and an Unknowns section checking not included, allowance and behind the walls
2:17 in the video It tells you what could change that number, like what’s not included, what’s only an allowance, and what nobody can see until the walls are open.

Second, go see an active job site, not the photo gallery. Finished photos show you their best day. A site in the middle of construction shows you every other day. Is it clean, is it organized, and how does the crew act when nobody’s taking pictures?

I put every question I ask a contractor on one interview checklist, so you can take it to your first meeting.

And that’s really the point. A low number only tells you what they’d charge. The unknowns tell you whether they’ve actually done this before.

Test 2: communication

Competence is only the first test. The second one starts before you ever sign anything.

Only 22% of homeowners put the lowest quote first when they pick a renovation partner. That’s from a survey of more than 2,800 homeowners across the United States, and 39% put a clear understanding of costs first.

Chart from the video: a survey of more than 2,800 homeowners, with 22% putting the lowest quote first and 39% putting costs first
2:43 in the video Only 22% of homeowners put the lowest quote first when they pick a renovation partner.

Here’s a question a homeowner asked on YouTube that I love. Their contractor wouldn’t put the price breakdown in an email or in the bid. His worry? They might show it to other contractors to get a better price. So how do you answer that?

Honestly, I get where the contractor’s coming from: their pricing is their business. So don’t ask how they priced it, ask what could change it. Ask for the scope in writing, meaning exactly what work is included, and the unknowns in writing, meaning what could change the price once work starts. You’re not shopping their bid, you’re protecting your project, and theirs.

And if they still won’t put the scope in writing before you’ve signed anything? That tells you how they’ll communicate once you’ve hired them. When money’s tight, the lowest bid looks better than ever, and a clear picture of the costs is something you can test before you sign.

The communication test is already running during the bid. How fast do they get back to you? Do they answer the question you actually asked, and is it a quick text or something you can find again in three weeks?

Texts are a black hole on a job. Decisions get lost in there. Every decision belongs in an email, even if it’s a quick summary after a phone call. So ask how they’ll update you each week. A good answer sounds like this:

  • Here’s what happened last week.
  • Here’s what’s happening this week.
  • Here’s what we need from you.

That weekly rhythm is what keeps the contractor from calling you in the middle of your kid’s soccer game. My contractor interview checklist has the exact communication questions I’d ask.

How they answer you before the contract is how they’ll answer you during it.

Test 3: character

The last test is the one I care about most. Harvard’s housing researchers projected back in July that remodeling spending would barely grow by the middle of 2027. So money stays tight, and the cheapest bid stays tempting. That’s why there’s one question I’d ask every contractor before price ever comes up:

Tell me about a project that didn’t go as planned.

This question tests character. Can I trust them? It’s the one people skip when the cheapest bid is all anyone talks about.

Every project has something go wrong. Every single one, mine included. So if someone tells you nothing ever goes wrong on their jobs, keep asking.

Then listen to how they answer. Do they tell you what actually happened, and what they did about it? And how did they break the news to that homeowner? If they can walk you through a hard moment calmly, without blaming everyone else, that’s who will be in your kitchen when something surprises you. And the best answers end with what they changed afterward, like a new step in their process, or a new question they now ask up front.

All my contractor interview questions, including the follow-⁠⁠ups to this one, are on the same free checklist.

There’s no best contractor in town

People ask me all the time, who’s the best contractor in town? Honestly, there isn’t one. There’s the best contractor for your project. The team that builds a beautiful new modern kitchen might not be your team for a hundred-⁠⁠year-⁠⁠old house.

And it’s never homeowner versus contractor. It’s one team building one home. You want the contractor you’d call first when something goes wrong, someone who could double as your emergency contact.

So that’s how I compare people: competence, communication and character. Price still matters, of course it does, but the lowest proposal is rarely the least expensive project.

Questions people ask

How do I compare contractors when the lowest bid looks best?

Compare people, not prices. I look at three things: competence, communication and character. Can they build it? Will they communicate well? And can I trust them?

What should a good contractor proposal tell me?

A good proposal doesn’t just give you a number. It tells you what could change that number, like what’s not included, what’s only an allowance, and what nobody can see until the walls are open.

What is an allowance in a contractor’s bid?

An allowance is just a placeholder budget for something you haven’t picked yet.

What if my contractor won’t put the price breakdown in writing?

Don’t ask how they priced it, ask what could change it. Ask for the scope in writing and the unknowns in writing. If they still won’t put the scope in writing before you’ve signed anything, that tells you how they’ll communicate once you’ve hired them.

What question should I ask every contractor before price comes up?

Tell me about a project that didn’t go as planned. Then listen to how they answer: what actually happened, what they did about it, and what they changed afterward.

Who is the best contractor in town?

Honestly, there isn’t one. There’s the best contractor for your project.

Sources

  1. Census Bureau: Monthly Construction Spending, September 2026 (November 2, 2026)
  2. NAHB Eye on Housing: Private Residential Construction Slips as Remodeling Weakens
  3. NAHB: Remodeling Market Sentiment Remains Stable in Third Quarter Despite Headwinds

Your next step

01

This checklist · free

The Contractor Interview Checklist

Every question I ask a contractor before anyone signs, the follow-⁠⁠ups, and what a good answer sounds like, so you can take it to your first meeting.

Your first moveBefore your next contractor meeting, write down one question: what could change this number? Ask it of every bid on your table.

02

Nicole’s Library · free

Get free access to Nicole’s whole library

One email opens every checklist from Nicole’s videos, right here on the site, and each new one as she adds it.

  • Who Gets a Vote Checklist
  • Stay-⁠⁠⁠or-⁠⁠⁠Go Checklist
  • Teammate Ladder: How to Raise a Problem With Your Builder
  • Kitchen Traffic Checklist
  • Open Walls Checklist
  • Cushion: Your Renovation Budget Template
  • Electrical Walkthrough Checklist
  • Last Payment Checklist
  • Kids’ Room Furniture Checklist
  • Lineup: Your Trade-⁠⁠⁠by-⁠⁠⁠Trade Decision Checklist
  • New Build Protection Checklist
  • Laundry Walk-⁠⁠⁠Through Checklist
  • Decide Together Worksheet
  • Appliance Specs Checklist
  • Lighting Plan Checklist
  • Finish Order Checklist
  • Before-⁠⁠⁠Drywall Checklist
  • Contractor Interview Checklist
  • Cabinet Order Checklist
  • Countertop Promise Checklist
  • Picture-⁠⁠⁠to-⁠⁠⁠Plan Checklist

03

Work with Nicole

Already mid-⁠⁠project?

Through R. Nickson Interiors, my team designs and manages whole-⁠⁠home projects. Or learn the process yourself with The Highly Designed Home Method.

Free, by email

Follow by email: Nicole's new resources

New checklists and articles from Nicole's videos, as she adds them.

Free checklists, templates, and guides from Nicole's videos
For your build or renovation: the process, design decisions, and life mid-⁠⁠build
You confirm on Nicole's Library.
Your email stays with Nicole and the team that runs this library. Never sold.
Thanks
Share this article
Nicole Roe
Written by

Nicole Roe

Luxury interior designer, founder of R. Nickson Interiors

I studied building construction at Georgia Tech, and I run R. Nickson Interiors, a full-⁠⁠service luxury interior design firm that takes on 10 to 12 projects a year. Our work has been in Architectural Digest and HGTV Magazine, and on the cover of Kitchen & Bath Business. I speak at High Point Market. Every resource here is built from my videos and fact-⁠⁠checked.

Architectural Digest work featured HGTV Magazine work featured Kitchen & Bath Business on the cover High Point Market speaker Georgia Tech building construction
About Nicole
Keep watching

More from Nicole

All videos
Video thumbnail: Everyone Gets an Opinion. Not Everyone Gets a Vote: How to Handle Comments on the House You're Building
Nov 23

Everyone Gets an Opinion. Not Everyone Gets a Vote: How to Handle Comments on the House You’re Building

A colorful house got a comment joking about divorce papers. How to handle comments on the house you're building: one rule, and three steps.

Video thumbnail: Their Renovation Moved Them In With Mom. Should You Move Out?
Nov 22

Their Renovation Moved Them In With Mom. Should You Move Out?

One broken light switch is the reason Kaylei Fleming's family ended up living with her mom. Should you move out, or stay and live through it?

Video thumbnail: One TikTok About Singh Homes Cost a Homeowner A$883,000. How I'd Raise a Problem Instead
Nov 21

One TikTok About Singh Homes Cost a Homeowner A$883,000. How I’d Raise a Problem Instead

An Australian court ordered a homeowner to pay 883,000 Australian dollars over one TikTok about his builder. Here's how I'd raise a problem instead.