The U.S. tariff on imported kitchen cabinets is scheduled to double on January 1, from 25 percent to 50. But the date that counts isn’t the day you order. It’s the day your cabinets reach a U.S. port.
If you’re planning a kitchen right now, you’re about to get the same email from every showroom: order before January 1. And I get why that feels urgent. But here’s what that email doesn’t explain.
The tariff is paid at the port
The tariff gets paid the day the cabinets come into the country. When this tariff first started, in October 2025, cabinets that were already at sea paid it the day they landed.
One overseas cabinet factory says a made-to-order kitchen takes about four weeks to build. Then it spends six or seven weeks on the water. That’s around eleven weeks from order to port. So a kitchen you order from overseas in November lands in January anyway.

And one more thing. This date has already slipped once. The increase was first set for January 2026, then pushed back a year. It could move again. I just wouldn’t plan a kitchen around that.
Your kitchen won’t cost twice as much
Now the good news: your kitchen is not about to cost twice as much. The tariff is charged on what the importer, the company bringing the cabinets into the country, paid for them. Not on your finished kitchen.
One cabinet seller put it like this. Say a set costs the importer $3,000. The current rate puts about $750 of tariff on that. After January 1, it’s about fifteen hundred. That’s real money, and every seller between the border and your kitchen marks it up. But it’s not your countertops or your install, and it doesn’t touch cabinets built here.
What January actually changes
Honestly, what I’d worry about is a cabinet that arrives after the deadline and turns out wrong, or doesn’t fit. If the first set is wrong, the replacement is a brand new shipment that lands after the deadline, so it pays the new rate.
So here’s what we do at my design firm. We order everything before demo day, the day the old kitchen comes out. I’m all for ordering early. But only once the plan’s finished.
Construction is for building, and planning is for deciding.
The deadline doesn’t make a rushed order cheaper. It makes a wrong one more expensive.
What a finished plan locks in
So what does finished actually mean? It’s a lot more specific than most people think. The day you sign that cabinet order, every drawer in your kitchen is locked in.
Think about the kitchen regrets people agree with most online:
- The trash can with no home.
- The spice drawer right next to the hot range.
- The microwave so high you can’t lift a hot bowl out of it.
- The sink that ate the whole island.
Every single one of those is a line on a cabinet order. If the microwave goes in a drawer, the cabinet under it is built as drawers instead of doors. If the trash goes by the sink, that’s a slide-out trash cabinet right next to the sink. Those decisions are cheap on paper, and expensive once they’re built. And a cabinet you have to reorder after January 1 comes back in at the doubled rate.
Zones, not the work triangle
I don’t design kitchens around the old work triangle anymore, the sink, the stove and the fridge in a triangle. I design them around zones.
Walk through a normal Tuesday dinner, from the fridge all the way to the trash. Where do the groceries land? Where do you chop? Where do the plates go after? And where do the backpacks get dropped? Because it’s always the backpacks. Every stop on that walk becomes a zone, and every zone becomes cabinets.

The drawer test, then the measurements
Then there’s one more check before you order: the drawer test. On our cabinet drawings, we label every drawer with what goes in it. Pots here. Spices here, away from the heat. Lunch boxes here. And we leave about 30 percent of every storage space empty, because that’s room for real life. If you can’t say what goes in a drawer, you’re not ready to order it.
The last piece is measurements. The final order waits until someone measures the real walls and openings, because a built room is never exactly the plan. On one of our own projects, we held off ordering even a single storage cabinet until the measurements were final. Even one.
Design for Tuesday, then order. Not the other way around.
Three questions before you sign
Once your plan is finished, there’s one more step before you sign. Starting January 1, imported cabinets are scheduled to pay a 50 percent tariff at the U.S. border. Three questions decide whether that extra cost lands on your kitchen invoice.
- Where do the cabinets, and the parts, come from? The first question isn’t the price. Cabinets built here in the U.S. don’t pay this tariff. But cabinet firms say a lot of U.S. cabinet makers import their parts, and imported parts can pay it. If they come from a country with a trade deal with the U.S., the tariff is often lower. You don’t need to know the rules. You just need the answer.
- Are your cabinets already sitting in a warehouse here, or are they still waiting to be built? If they’re already in a warehouse here, they paid the old 25 percent tariff when they arrived, not the new 50. If they’re still being built overseas, count the weeks to January 1, because the later they land, the more likely they pay the new rate. And for anything made to order, get the lead time, the weeks from order to delivery, in writing. Semi-custom, so cabinets with some options to choose from, usually takes about four to eight weeks. Full custom, built from scratch, takes eight to twelve weeks or more.
- Is the price fixed the day I sign? This is how I’d ask it: help me understand this price. Is it fixed the day I sign, or could a tariff change show up on the invoice? Your contractor isn’t the enemy here. It’s one team building one kitchen, and a good contractor would much rather answer that now than after the invoice shows up.
And whenever they do arrive, open every box the day it comes. Always, always, always. You want to catch damage while there’s still time to fix it.
I put the zones, the drawer test, what to measure and all three questions into a free checklist, ready to send.
Honestly, the January deadline is a great reason to finish a plan, and a terrible reason to start one.
Questions people ask
When does the tariff on imported kitchen cabinets double?
The U.S. tariff on imported kitchen cabinets is scheduled to double on January 1, from 25 percent to 50. The date that counts is the day your cabinets reach a U.S. port.
Will the cabinet tariff double the cost of my kitchen?
Your kitchen is not about to cost twice as much. The tariff is charged on what the importer paid for the cabinets, not on your finished kitchen. It’s not your countertops or your install, and it doesn’t touch cabinets built here.
If I order cabinets from overseas in November, will they beat the deadline?
A made-to-order kitchen takes about four weeks to build, then it spends six or seven weeks on the water. So a kitchen you order from overseas in November lands in January anyway.
Do cabinets built in the U.S. pay the tariff?
Cabinets built here in the U.S. don’t pay this tariff. But cabinet firms say a lot of U.S. cabinet makers import their parts, and imported parts can pay it.
How long do semi-custom and full custom cabinets take?
Semi-custom usually takes about four to eight weeks. Full custom, built from scratch, takes eight to twelve weeks or more.
How should I ask about the cabinet price before I sign?
Help me understand this price. Is it fixed the day I sign, or could a tariff change show up on the invoice?
Sources
- Federal Register, January 9, 2026: the published notice of the increase to 50 percent
- Tax news: the increase postponed by one year (January 2026)
- An overseas cabinet factory’s timeline: build time and weeks on the water
- A cabinet seller’s explainer: what the tariff is charged on, and the worked example
- A cabinet seller’s notes for contractors: cabinets built in the U.S. and the October 2025 start
- A remodeler’s 2026 lead-time tracker: semi-custom and full custom cabinets
Your next step
01
This checklist · free
The Cabinet Order Checklist
What I’d decide before any cabinet order, starting with your kitchen zones, the drawer test and what to measure, plus the three questions to ask first.
Your first moveWalk through a normal Tuesday dinner, from the fridge all the way to the trash, and write down every stop: each one is a zone, and each zone becomes cabinets.
02
Nicole’s Library · free
Get free access to Nicole’s whole library
One email opens every checklist from Nicole’s videos, right here on the site, and each new one as she adds it.
- Who Gets a Vote Checklist
- Stay-or-Go Checklist
- Teammate Ladder: How to Raise a Problem With Your Builder
- Kitchen Traffic Checklist
- Open Walls Checklist
- Cushion: Your Renovation Budget Template
- Electrical Walkthrough Checklist
- Last Payment Checklist
- Kids’ Room Furniture Checklist
- Lineup: Your Trade-by-Trade Decision Checklist
- New Build Protection Checklist
- Laundry Walk-Through Checklist
- Decide Together Worksheet
- Appliance Specs Checklist
- Lighting Plan Checklist
- Finish Order Checklist
- Before-Drywall Checklist
- Contractor Interview Checklist
- Cabinet Order Checklist
- Countertop Promise Checklist
- Picture-to-Plan Checklist
03
Work with Nicole
Already mid-project?
Through R. Nickson Interiors, my team designs and manages whole-home projects. Or learn the process yourself with The Highly Designed Home Method.