On October 29, D R Horton, the biggest homebuilder in America by volume, told investors they plan to keep their incentives high through their next business year. Incentives are the deals and perks a builder uses to get you to sign. If you’re about to build, that’s real money on the table, and I’d hate to watch you spend it on a faucet you could swap in an afternoon.
Builders are working harder to get you to sign
Here’s the line from their call:
We expect our incentive levels to remain elevated in fiscal 2027.
And here’s how hesitant buyers are: nearly one in four of their sales cancelled in the quarter that ended in September. Their CEO said buyers are out there “with a want, just having a hard time moving forward.” So builders are working harder to get you to sign.
He also got specific about what those incentives actually look like. Depending on the community, it’s a rate buydown, where they pay to lower your mortgage rate, or included features, or a lower price.
The rate is a conversation for your lender, not me. I’m an interior designer with a construction background, so I look at the house. And when a builder says included features, most people walk into the builder’s design center, the showroom where you pick finishes, and choose the prettier stuff: nicer faucets, upgraded flooring, a fancier light over the island.
The icing and the cake
I get it, that’s the fun part. But almost all of that can be changed after you move in. Think of it like a cake. The design center is the icing. What’s inside the walls is the cake itself, and you can’t re-bake it once it’s out of the oven.
The walls are a different story. There’s nothing worse than moving into your brand new kitchen and realizing there’s no outlet where the coffee maker goes. Once the drywall, the wallboard, goes up, if you want to add an outlet or move a light, you’re opening a finished wall, patching it, and painting it again.

I’ll give you one of mine. When I redid my own primary bathroom, I wish I would have done heated floors. That’s a wire under the tile, and you don’t add it later without pulling the tile back up.
My rule: spend it inside the walls
So my rule is simple. Spend the builder’s offer on what lives inside the walls, like outlets, wiring and lighting, and save the pretty stuff for later.
Will every builder say yes? No. If the wood frame of the house is already standing, the walls are set. So ask early, before you sign, and ask when the deadline is for changes.
Because honestly, finishes can change later. The walls can’t.
The walk before drywall
65% of home builders were offering sales incentives, like discounts and free upgrades, in October, according to the National Association of Home Builders. If you’re building next year, I’d beg you to spend that money on what’s hidden inside the walls. There’s one day that decides what you can still change cheaply.
It’s the walk before drywall, when the wall frames are up but the wallboard isn’t on yet. The framing is up, the wires are in, and you can see right into every wall. If I could only walk through your project one time, this is the day I’d pick.
The things I’d ask for aren’t glamorous. Nobody’s pinning them on Pinterest. They’re the things that make a house work on a Tuesday.
- Blocking. That’s just a piece of wood between the studs, the upright boards inside the wall, so you have something solid to hang things on later: behind the TV, behind heavy art, and in the shower where a grab bar might go one day. Putting blocking in before drywall is one of the cheapest upgrades you can make. After drywall, it’s a hole in your wall.
- Outlets where life actually happens. Walk your morning. Where do you charge your phone? Where does the lamp go by your bed? Then walk your evening. Where do the backpacks land when everyone comes through the door? It’s always those backpacks, and that wall needs an outlet and a light switch right there. I would still have the electrician put a plug behind the toilet, so a bidet seat or a night light has power later. Codes are different everywhere, so your builder and your electrician will tell you what’s allowed.
- Lighting, planned with the house, not tacked on after. The recessed lights, the little ones sunk into the ceiling, are bright, flat light, good for cleaning. The light you actually live in sits at eye level, with sconces, the lights mounted on the wall, and lamps. So decide where the sconces go now, because that’s a wire in the wall, and ask for dimmers on them.

All three are on my free checklist, plus what to look for on that walk.
A faucet can wait. A wire in the wall can’t.
Four questions before you sign
How you ask matters as much as what you ask for. D R Horton, America’s biggest builder, says its incentives are decided community by community, which means what you walk away with can depend on what you ask for. So before you sign, there are four questions I’d ask about any incentive a builder offers you.
- What does this actually include? An allowance is the money a builder gives you for upgrades, and I ask the same thing about every one. An offer can sound big, and then you find out it covers the faucet and not much else.
- Can it go toward electrical and structural options, like outlets and framing, not just the design center? That’s the question almost nobody asks. And when the builder says something confusing, here’s my line: help me understand. It keeps it a conversation, not a fight.
- What’s the last day to make changes, and when is the walk before drywall, that last look at the open walls? Put both dates on your calendar, because later has a funny way of arriving much faster than people think.
- Will you put that in writing? Texts are a black hole for a builder. After every yes, send an email that’s like a summary of what we agreed, what it costs, and when it happens.
Your builder isn’t the enemy here. It’s one team building one home. You’re just making sure the yes lands where it counts.
I wrote these four questions out for you on the free checklist too.
Big decisions first
Here’s the order I’d make your home’s decisions in. Big decisions first, little decisions second:
- Function.
- The space plan, where the rooms and furniture go.
- Materials and lighting.
The pretty finishes will come soon, I promise, and they’ll look better on a house that actually works.
Construction is for building. Planning is for deciding.
So if your builder said yes today, would it go to the tile, or behind the walls?
Questions people ask
How should I spend a builder’s incentives?
Spend the builder’s offer on what lives inside the walls, like outlets, wiring and lighting, and save the pretty stuff for later. Finishes can change later. The walls can’t.
What is the walk before drywall?
It’s when the wall frames are up but the wallboard isn’t on yet. The framing is up, the wires are in, and you can see right into every wall.
What is blocking in a wall?
That’s just a piece of wood between the studs, the upright boards inside the wall, so you have something solid to hang things on later. Putting blocking in before drywall is one of the cheapest upgrades you can make.
What should I ask before drywall goes up?
Ask for blocking, outlets where life actually happens, and lighting planned with the house, not tacked on after.
What questions should I ask about a builder’s incentive?
What does this actually include? Can it go toward electrical and structural options, like outlets and framing, not just the design center? What’s the last day to make changes, and when is the walk before drywall? Will you put that in writing?
Will every builder say yes to changes inside the walls?
No. If the wood frame of the house is already standing, the walls are set. So ask early, before you sign, and ask when the deadline is for changes.
Sources
Your next step
01
This checklist · free
The Before-Drywall Checklist
What I’d ask a builder for before the drywall goes up, what to look for on the walk before drywall, and the four questions I’d ask about any incentive.
Your first moveAsk your builder for two dates: the last day to make changes, and the day of the walk before drywall, then put both on your calendar.
02
Nicole’s Library · free
Get free access to Nicole’s whole library
One email opens every checklist from Nicole’s videos, right here on the site, and each new one as she adds it.
- Who Gets a Vote Checklist
- Stay-or-Go Checklist
- Teammate Ladder: How to Raise a Problem With Your Builder
- Kitchen Traffic Checklist
- Open Walls Checklist
- Cushion: Your Renovation Budget Template
- Electrical Walkthrough Checklist
- Last Payment Checklist
- Kids’ Room Furniture Checklist
- Lineup: Your Trade-by-Trade Decision Checklist
- New Build Protection Checklist
- Laundry Walk-Through Checklist
- Decide Together Worksheet
- Appliance Specs Checklist
- Lighting Plan Checklist
- Finish Order Checklist
- Before-Drywall Checklist
- Contractor Interview Checklist
- Cabinet Order Checklist
- Countertop Promise Checklist
- Picture-to-Plan Checklist